10 Tph TDF Line Project In Iraq
The published Iraq record lists a 10 TPH project rate for a TDF line. Treat this as project information; it is not a verified output guarantee for every feed or configuration.
PROJECT / 2024
TDF recycling line
Supplied project records. Project-specific figures depend on feedstock and operating conditions.

PROJECT ROUTE
The supplied project record identifies 50 mm tire-derived fuel as the target product for cement fuel.
Review feedstock, process configuration and the receiving specification together for a new project.
READ THE PROJECT RECORD
The supplied record identifies 50 mm tire-derived fuel for cement fuel, with a published project rate of 10 TPH. For a similar project, confirm the tire feedstock, receiving specification and site conditions before comparing configurations.
PROJECT PHOTOGRAPHY
The published Iraq record lists a 10 TPH project rate for a TDF line. Treat this as project information; it is not a verified output guarantee for every feed or configuration.
The stated target is 50 mm tire shreds. Confirm the receiving fuel specification and the selected shredding and screening arrangement when comparing a similar project.
The supplied installation photographs and video document this project record. Review the process route alongside the images rather than inferring equipment performance from photographs alone.
Use the Iraq case as a reference for project discussion. Provide your own tire feed, target product and country so that a suitable configuration can be assessed.
CONTACT US
Start with your raw material and the output you want to produce. We will use your project requirements to discuss a suitable configuration.
WANT TO KNOW MORE? WhatsApp +86 13770963575
CONTACT US